Transportation & Logistics

Feasibility Study and Design for the Denchai - Chiang Mai Double Track Rail Project

Client:  Office of Transport and Traffic Policy and Planning

The double track railway from Denchai to Chiang Mai. Covering an area of Phrae, Lampang, Lamphun and Chiang Mai. The track will be one meter wide (Meter Gauge). Level crossings are to be improved so that travelling will be faster and more convenient.

Read more

Feasibility Study and Design for High speed train project, Bangkok – Chiang Mai

Client:  Office of Transport and Traffic Policy and Planning

The Bangkok – Chiang Mai high speed train comprises of 2 phases, which are Bangkok - Phitsanulok and Phitsanulok – Chiang Mai. The train is designed to have maximum speed of 300 Km/hour and take 3.16 hours from Bangkok to Chiang Mai. TEAM Group has undertaken the feasibility study on engineering, economic, social, financial and investment aspects, definitive and architectural design, tender document preparation, EIA, and public participation activities.

Read more

Feasibility Study Review, Preliminary Design Modification, and Preparation of Tender Documents for Pink Line Project, Khae Rai-Min Buri Section

Client:  Mass Rapid Transit Authority of Thailand

The Pink Line mass rapid transit system, Khae Rai-Min Buri section under Mass Rapid Transit Authority of Thailand (MRTA) will accommodate travel demand in North Bangkok. The Pink Line has been defined as a minor mass transit system in the form of elevated straddle monorail.

Read more

Survey and Detailed Design of the Highway No.225 (Nakhon Sawan – Chum Saeng District) Construction Project

Client:  Department of Highways

The Highway No.225 (Nakhon Sawan – Chum Saeng District) Construction Project involves increasing traffic lanes from two to four along the 20-kilometer section from Nakhon Sawan to Chum Saeng District in order to accommodate increasing traffic volume. The project will help facilitate business trips by car as well as goods transportation.

Read more