Environmental Management

Natural Gas Pipeline to Ban Pho and Ban Len Power Plants

Client: Gulf BP Co., Ltd. and Gulf BL Co., Ltd.

Gulf BP and Gulf BL desired to construct a natural gas pipeline to meet the demand of its two power plants, Ban Pho and Ban Len, in the Hi-Tech Industrial Estate (Ban Wa) of Bang Pa In District in Phra Nakhon Si Ayutthaya. The pipeline alignment will start from the Nainat Village in Ban Wa Subdistrict and run 3.3 km to the estate.

Read more

Phou Ngoy Hydropower Project, Lao People’s Democratic Republic

Client: Charoen Energy and Water Asia Co., Ltd.

Located in the Champasak District of Champasak Province in Lao PDR, the Phou Ngoy Hydropower Project comprises a run-of-river dam on the Mekong River. Its expected generating capacity is 651 MW and the electricity will be used domestically and sold to Thailand. TEAM Consulting Engineering and Management,

Read more

Replacement of Units 4 – 7 at Mae Moh Power Plant, Lampang

Client: Electricity Generating Authority of Thailand (EGAT)

Having a combined capacity of 600 megawatt, the units 4 – 7 of the lignite-burning Mae Moh power plant have operated for more than 25 years. Construction of the new plant as replacement for these units was planned to meet the domestic demand for electricity and to ensure national energy security. The new plant, with the 600 megawatt capacity,

Read more

Nam Ngum 2 Hydroelectric Power Project, Lao PDR

Client: CH. Karnchang Public Company Limited / SouthEast Asia Energy Limited / Nam Ngum 2 Power Company Limited

Nam Ngum 2 Hydroelectric Power Project is located at Baan Huay Bor, Vientiane. The project was constructed, managed, and supported by a group of Thai investors focused on GMS market. The concrete-faced rock-fill dam (CRFD) has a reservoir with a capacity of 6,774 million cubic metres, and a power house installed with a 615 MW capacity.

Read more